What Happens During Solar Installation in DC: A Step-by-Step Guide
The DC solar installation process takes 6–12 weeks from contract to power-on. Here's every step from site survey to Pepco PTO.
The DC solar installation process takes 6–12 weeks from contract to power-on. Here's every step from site survey to Pepco PTO.
DC solar systems pay for themselves in 2-3 years with the $10,000 SAPP rebate, or 4-6 years at full price. See the full math with real 2026 numbers.
Petworth and Brightwood are two of DC's best neighborhoods for rooftop solar — mostly outside historic districts, good south-facing rear roofs, and a history of community group buys. Here's the 2026 guide.
DC SRECs are worth $360-$455 per credit in 2026. See real contract pricing, who buys them, and how to maximize your solar income in Washington DC.
Pair solar panels with a heat pump and you can eliminate your gas bill entirely. Here's how the all-electric combo works in DC, what it costs, and how to capture 2026 rebates before they expire.
DC homeowners with EVs can eliminate both their electricity and gas bills with solar. Two incentives expire in 2026 — here's the sizing guide, cost breakdown, and DC-specific incentive stack.
Georgetown homeowners can go solar — but the Commission of Fine Arts review, CFA guidelines, and 10–14 week timeline require more planning than a standard DC install. Here's what to know.
DC solar takes 3–6 months — not because of installation, but permitting. Here's how DCRA, Pepco interconnection, and the new GRID Act affect your timeline.
Income-qualified DC homeowners can get up to $10,000 back through Solar Advantage Plus (SAPP) — but funding is first-come, first-served. Here's who qualifies and how to apply.
Take our 30-second survey to see if your home qualifies for solar at $0 cost to you